【24h】

Reasonable Coal Pillar Size Design in Xiaoming Mine

机译:孝感矿井合理的煤柱尺寸设计

获取原文

摘要

The pillar size has great influence not only on the stability of surrounding rock, but also on the recovery rate of coal resources, which directly affects the economic benefits of coal. According to XiaoMing tiefa coalmining group geolo-gical conditions and the use of coal pillar, it adopts field measurement, numerical simulation and theory calculation methods to get small coal pillar width and reasonable wide size of coal pillar. Use rock stratum detect to find out the fissures, faults, broken area; analyze the coal pillar stress and displacement distribution of the different pillar widths (3,5,8, 10,15and20m) by FLAC~(2D) simulation of numerical simulation software, determine a reasonable size finally.It provides a guarantee of security for the exploitation of the mine.
机译:支柱尺寸不仅对周围岩石的稳定性有很大的影响,而且对煤炭资源的恢复率直接影响了煤炭的经济益处。据邓小平煤矿煤层气的良性 - 门诊条件和煤柱的使用,采用现场测量,数值模拟和理论计算方法,获得小型煤柱宽度和合理的煤柱。使用Rock Stratum检测来找出裂缝,断层,破碎区域;通过FLAC〜(2D)模拟数值模拟软件的模拟分析煤柱应力和分配的不同支柱宽度(3,5,8,15,15和20m),确定合理尺寸。它为安全保证提供了保证开采矿井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号