首页> 外文会议>International Conference on Mechanic Automation and Control Engineering >The cost control of communication construction projects: Case study of Zhejiang Post and Telecommunication Construction Corporation
【24h】

The cost control of communication construction projects: Case study of Zhejiang Post and Telecommunication Construction Corporation

机译:通信建设项目的成本控制:浙江邮电建设公司案例研究

获取原文

摘要

With the increasing competition of communication industry, how to improve the economic efficiency of construction project has been a very urgent task for the communication construction enterprises. This article first posts the importance of cost control in communication construction project. Then further applications are integrated in the cost control of construction projects to Taizhou project department in the sample enterprise, such as the method of entire procedure cost control and project portfolio management. In addition, the network planning techniques, cost variance method and cost analysis table method are used to make quantitative analysis in the cost control of construction. The conclusion is that the method of entire procedure cost control on individual project reduces 7.2% of the unit cost and the method of project portfolio management on multi-project reduces 5.4% of the total target cost. Cost control in construction projects is approved a possible way to reduce construction cost.
机译:随着通信行业竞争的日益增加,如何提高建设项目的经济效率一直是沟通建设企业一项非常紧迫的任务。本文首先介绍了通信建设项目中成本控制的重要性。然后,进一步的申请将建设项目的成本控制集成在示例企业中的泰州项目部门,如整个程序成本控制和项目组合管理的方法。此外,网络规划技术,成本方差方法和成本分析表方法用于对建筑成本控制进行定量分析。结论是,单个项目的整个程序成本控制方法减少了7.2%的单位成本,多项目项目组合管理方法减少了5.4%的目标成本的5.4%。建筑项目中的成本控制被批准减少施工成本的可能方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号