首页> 外文会议>Biennial European Particle Accelerator Conference >SECONDARY ELECTRON YIELD MEASUREMENTS AND GROOVE CHAMBERS UPDATED TESTS IN THE PEP-II BEAM LINE
【24h】

SECONDARY ELECTRON YIELD MEASUREMENTS AND GROOVE CHAMBERS UPDATED TESTS IN THE PEP-II BEAM LINE

机译:二次电子收益率测量和凹槽室在PEP-II梁线中更新测试

获取原文

摘要

Beam instability caused by the electron cloud has been observed in positron and proton storage rings and it is expected to be a limiting factor in the performance of the positron Damping Ring (DR) of future Linear Colliders such as ILC and CLIC [1, 2]. In the Positron Low Energy Ring (LER) of the PEP-II accelerator, we have installed vacuum chambers with rectangular grooves in a straight magnetic-free section to test this promising possible electron cloud mitigation technique. We have also installed a special chamber to monitor the secondary electron yield of TiN and TiZrV (NEG) coating, Copper, Stainless Steel and Aluminum under the effect of electron and photon conditioning in situ in the beam line. In this paper, we describe the ongoing R&D effort to mitigate the electron cloud effect for the ILC damping ring, the latest results on in situ secondary electron yield conditioning and recent update on the groove tests in PEP-II.
机译:在正电子和质子储存环中观察到电子云引起的光束不稳定性,并且预计在未来的线性侵占器(如ILC和Clic)的正电子阻尼环(DR)的性能下是限制因素[1,2] 。 在Pep-II促进剂的正电子低能量环(LER)中,我们已经在直线磁截面中安装了具有矩形槽的真空室,以测试这种有前途的电子云缓解技术。 我们还安装了一个特殊的室,以监测电子和光子调节在梁线上的电子和光子调节的效果下的锡和TizRV(NEG)涂层,铜,不锈钢和铝的二次电子产量。 在本文中,我们描述了正在进行的研发努力,以减轻ILC阻尼环的电子云效应,最新结果在原位二级电子产量调理和最近更新PEP-II中的凹槽试验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号