This paper presents an advanced construction technology for assembling pre-stressed box arch with strips and blocks on a 133m long cable-stayed steel Bailey arch truss for the Wuqiangxi Bridge at Hunan hydropower station in 1989. This project example set a record of completing the construction within 143 days.