首页> 外文会议>China-Japan International Conference on MechatronicsCJCM >Simulation and Optimization of Job Shop Scheduling for Dry Transformers Based on eM-Plant
【24h】

Simulation and Optimization of Job Shop Scheduling for Dry Transformers Based on eM-Plant

机译:基于EM-植物的干式变压器作业商店调度模拟与优化

获取原文
获取外文期刊封面目录资料

摘要

The model of job shop scheduling to fabricate dry transformers is constructed by Object-oriented Petri Net (OPN) in this paper, the essential attributes and ways of all object classes are defined to judge if there is a deadlock in the system. The overall OPN model of job shop scheduling is built according to relations of event actions in the manufacturing system. Product processes in the job shop is simulated by eM-Plant software to reconstruct and optimize the manufacturing system at last.
机译:在本文中,由面向对象的Petri网(OPN)构建了制造干式变压器的作业商店模型由面向对象的Petri网(OPN)构建,所有对象类的基本属性和方式被定义为判断系统中有死锁。 作业商店调度的整体OPN模型是根据制造系统中的事件动作的关系构建的。 作业商店中的产品流程由EM-Plant软件模拟,以便终于重建和优化制造系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号