A new framework of critical chain scheduling in project management

机译:项目管理中的关键链调度新框架

获取原文

摘要

This paper proposes a new critical chain scheduling method in project management. The authors have already proposed a theoretical model, which provides an optimal total size of dummies to be inserted in the initial baseline schedule of a given project. Dummies, which are occasionally referred to as buffer, are useful to absorb schedule delays caused by a variety of uncertainties. Given the total size of dummies, this study explores for some useful rules under which we should allocate the dummies in the initial baseline schedule to generate a buffered schedule. Some computational experiments derive several important properties of buffered schedules with a view to demonstrating the effectiveness of those rules particularly in critical chain scheduling.
机译:本文提出了一种项目管理中新的关键链调度方法。作者已经提出了理论模型,它提供了在给定项目的初始基线计划中插入的符号的最佳总大小。偶尔称为缓冲器的假人可用于吸收由各种不确定性引起的时间表延迟。鉴于假人的总大小,这项研究探讨了一些有用的规则,我们应该在初始基线计划中分配假人以生成缓冲时间表。一些计算实验导出了缓冲时间表的几个重要属性,以便在临界链调度中展示这些规则的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号