首页> 外文会议>International Conference on Mine Hazards Prevention and Control >Establishment of Surrounding Rock Structure Model of Gob-side Entry and Analysis On its Stability
【24h】

Establishment of Surrounding Rock Structure Model of Gob-side Entry and Analysis On its Stability

机译:建立围岩岩石结构模型的GOB侧进入及其稳定性分析

获取原文

摘要

This paper considers the characteristics of the surrounding rock deformation of gob-side entry, motion law of the overlying strata after mining and the structure of roadside supporting. The gob-side roof structure has been simplified as an elastic mechanical model which is composed of gangue in mined-out area, roadside packing and the roadside coal, and the anti-force on the main roof has been calculated under the conditions. By the use of controlling variables, the main factors of the anti-force on the main roof have been analyzed, which are backfill body width and backfill body elastic modulus, and the backfill body compression formula has been obtained. On this basis, using the method of UDEC numerical simulation, stress state of the key roof rock of the gob-side entry has been simulated, and rhe relationship of backfill body width and backfill body elastic modulus with roof convergence has been obtained.
机译:本文考虑了采矿后覆盖阶层的环侧进入,覆盖阶层的运动法的周围岩石变形特征及路边支撑。 GOB侧屋顶结构已被简化为弹性机械模型,该模型由挖掘区域,路边填料和路边煤中的煤矸石组成,并且在条件下计算了主屋顶上的抗力。通过使用控制变量,已经分析了主屋顶上的抗力的主要因素,这是回填体宽度和回填体弹性模量,并获得回填体压缩公式。在此基础上,使用UDEC数值模拟的方法,已经模拟了GOB侧进入的钥匙屋顶岩石的应力状态,并且已经获得了回填体宽度和屋顶收敛的回填体弹性模量的RHE关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号