首页> 外文会议>ASME International Manufacturing Science and Engineering Conference >ROBUST WORK PLANNING AND DEVELOPMENT OF A DECISION SUPPORT SYSTEM FOR WORK DISTRIBUTION ON A MIXED-MODEL AUTOMOTIVE ASSEMBLY LINE
【24h】

ROBUST WORK PLANNING AND DEVELOPMENT OF A DECISION SUPPORT SYSTEM FOR WORK DISTRIBUTION ON A MIXED-MODEL AUTOMOTIVE ASSEMBLY LINE

机译:稳健的工作规划和开发在混合模型汽车装配线上运行的决策支持系统

获取原文
获取外文期刊封面目录资料

摘要

Line balancing is a very resource-intensive and time consuming process which is highly reliant on the experience and expertise of a few employees. Line balancing is made even more complex due to the high level of option content in premium automobiles. The current phase of this study involves hands-on training on the automotive assembly line, precedence relationship mapping of all the tasks involved on a pilot assembly line, identification of constraints, and development of a strategy to manage option content and constraints. The second phase will include the generation of an optimal line balance through optimization on expected station utilization. The current line balancing process relies significantly on the experience level of the utility workers and team leaders. Although initially labor intensive, the precedence mapping exercise and option coding strategy will facilitate the development of a decision support system to aid the human decision-maker in making data-driven decisions about work distribution.
机译:线路平衡是一种非常资深密集型和耗时的过程,这些过程非常依赖于少数员工的经验和专业知识。由于高级汽车中的高度选择内容,线路平衡更加复杂。本研究的当前阶段涉及汽车装配线上的动手培训,所涉及导频装配线的所有任务的优先关系映射,限制和发展来管理选项内容和约束的策略。第二阶段将通过对预期站利用的优化来包括产生最佳线路平衡。目前的线路平衡过程依赖于公用事业工人和团队领导者的体验水平。虽然最初的劳动密集,优先绘图运动和期权编码策略将有助于制定决策支持系统,以帮助人类决策者制定关于工作分配的数据驱动的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号