首页> 外文会议>International autumn seminar on propellants, explosives and pyrotechnics >Monitoring and Analysis of the Explosion Vibration of Underground Tunnel Construction in Urban Area
【24h】

Monitoring and Analysis of the Explosion Vibration of Underground Tunnel Construction in Urban Area

机译:城市地下隧道建设爆炸振动的监测与分析

获取原文

摘要

This paper discusses the monitoring work of the blasting vibration of the Qingdao side connection project which belongs to the Kiaochow Bay undersea tunnel. The propagation disciplines of the particle vibration velocity of the ground along the vertical line of the tunnel center are drawn. In the way discussed in this article, the particle vibration velocity of the ground is less than 2 cm·s-1 in the range of 25 m to the surface blasting center and the speed meets the provision for brick concrete buildings in Safety Regulations for Blasting GB6722 (2003), but out the range of 25 m to the surface blasting center, it would be needed to change the blasting parameters to keep safety. The K and α (coefficients in Sodev's formula) of this area is calculated by linear regression.
机译:本文讨论了青岛侧连接项目爆破振动的监测工作,属于Kiaochow Bay Undersea隧道。绘制沿着隧道中心垂直线的地面粒子振动速度的传播学科。在本文中讨论的方式,地面的粒子振动速度小于2cm·S-1,在25米到表面爆破中心的范围内,速度符合爆破安全规定的砖混凝土建筑物的规定GB6722(2003),但耗尽了25米到表面爆破中心,需要改变爆破参数以保持安全。该区域的K和α(SODEV的配方中的系数)通过线性回归来计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号