首页> 外文会议>International conference of the Associatied Research Centers for Urban Underground Space >Convergence and Settlement Monitoring During Construction of Metro Tunnels
【24h】

Convergence and Settlement Monitoring During Construction of Metro Tunnels

机译:地铁隧道施工期间的收敛性和解决监测

获取原文

摘要

Monitoring the convergence and settlement of metro tunnels is a principal means for selecting the appropriate excavation and support methods in the design. In this paper,briefly describes the basic convergence and settlement monitoring requirements,analyzes the tunnel convergence and settlement monitoring accuracy difference between mountain area and urban area,discusses the measurements of deformations at ground surface,measurements of deformations on the ground and measurements in the tunnel,especially gives an example of vertical convergence monitoring,introduces the data processing method and the quality evaluating method based on the measured data. Mainly explores the technique of tunnels' crown settlement monitoring,convergence monitoring and the Automatic Deformation Monitoring methods. It is put forward that the monitoring job during the construction of metro tunnels can be done with both traditional and modern surveying instruments and the job will be significant to the same kinds of projects.
机译:监测Metro Tunnels的收敛性和结算是用于在设计中选择适当的挖掘和支持方法的主要方法。本文简要介绍了基本收敛和结算监测要求,分析了山区和城市地区之间的隧道收敛和沉降监测精度差异,探讨了地面变形的测量,在地面上的变形测量​​和隧道测量的测量,特别是给出了垂直收敛监视的示例,介绍了基于测量数据的数据处理方法和质量评估方法。主要探讨隧道冠沉降监测,收敛监测和自动变形监测方法的技术。提出了在地铁隧道建造期间的监测工作可以通过传统和现代测量仪器来完成,这项工作将对同类项目进行重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号