首页> 外文会议>International Symposium on Assembly and Manufacturing >Online Workload Control with Shifting Bottlenecks and Due Date Constraints
【24h】

Online Workload Control with Shifting Bottlenecks and Due Date Constraints

机译:通过转换瓶颈和截止日期约束的在线工作负载控制

获取原文

摘要

In this paper an adaptive order release strategy for job shop production with well-defined routes is presented. The release strategy is a combination of different known methods. It balances altering machine load of a plant due to different products produced in the job shop. Additionally the constraint of the due date of each individual order is kept Balanced load on all machines is achieved by controlling the sequence of order release and the release time. For the adjustment of the controller only the desired average WIP (Work in Process) of each machine has to be set. The strategy is tested with two plant models based on Petri net simulations.
机译:本文介绍了具有明确定义路线的作业商店生产的自适应订单发布策略。发布策略是不同已知方法的组合。由于在作业商店生产的不同产品,它平衡改变工厂的机器负荷。另外,通过控制订单释放序列和释放时间来实现每个单独顺序的截止日期的约束。对于控制器的调整,只需要设置每台机器的所需平均WIP(过程中的工作)。该策略是用基于Petri网仿真的两种植物模型进行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号