首页> 外文会议>International Conference on Mine Closure >Waste dump steep slope construction learnings
【24h】

Waste dump steep slope construction learnings

机译:垃圾堆陡坡施工学习

获取原文

摘要

Optimising and testing final waste dump batter slope parameters prior to reclamation is a valuable step within the mine closure planning process. The aim of the testing is to increase knowledge of site specific characteristics, verify performance against the closure criteria, and assist in revising what are often high level closure costs. Newmont Boddington Gold (Boddington) is owned and operated by Newmont Asia Pacific and is located approximately 130 km southeast of Perth in Western Australia. The operations consist of two large hard rock open pits, with a current mine life until 2029, with processing of stockpiled material until 2032. The expected final footprint of the waste rock dumps is 811 hectares. In late 2014, Boddington constructed a rehabilitation trial on an outer slope of Waste Rock Dump 7 (WRD07). The primary goals of the trial were to: i) construct and verify if a steeper than currently approved slope can remain safe and stable whilst meeting closure criteria, and ii) understand the water balance of the slope. Key variables tested within the trial include a 22 degree batter angle, and three surface treatments each with varying ratios of rock armouring within the two metre oxide cover. The same prescribed gravel and topsoil materials were applied to the three surface treatments. If the trial can demonstrate that a safe and stable slope can be constructed, expected benefits to mine closure planning and execution includes a reduction in dozer pushing costs, better designed surface water drainage system, and more accurate prediction of the volume of leachate that will be required to be managed. Assessment of the slope's performance is monitored through water balance measurements, erosion assessment and vegetation growth assessment. Monitoring equipment installed within the trial includes a lysimeter, six soil sensory nests, and a runoff/interflow collection system. This paper presents a case study of the construction of the trial. The information obtained from the project will be highly valuable in assessing the current closure plans and performance against closure criteria.
机译:在回收之前优化和测试最终废物丢弃面板斜率参数是矿井闭合规划过程中的宝贵步骤。测试的目的是增加现场特定特征的知识,验证对闭幕标准的性能,并协助修改往往是高水平的闭合成本。 NewMont Boddington Gold(Boddington)由NewMont Asia Pacific拥有和运营,位于澳大利亚西部的珀斯东南约130公里。该运营由两种大型硬岩开口坑,目前的矿山寿命直到2029年,加工储存材料直到2032年。废弃岩石垃圾堆的预期最终足迹是811公顷。 2014年底,Boddington在废摇滚倾倒7(WRD07)的外坡上建立了一个康复试验。审判的主要目标是:i)构建和验证是否比目前批准的坡度更陡峭,同时满足闭幕标准和ii)了解坡度的水平衡。在试验中测试的关键变量包括22度的面糊角度,以及三个表面处理,每个面部处理具有两个氧化物覆盖物内的岩石铠装的不同比例。将相同的规定的砾石和表土材料应用于三种表面处理。如果试验可以证明可以构建安全稳定的坡度,则挖掘挖掘规划和执行的预期效益包括推荐器推动成本,更好设计的地表排水系统,更准确地预测将是渗滤液的量需要管理。通过水平测量,侵蚀评估和植被生长评估来监测对坡性能的评估。在试验中安装的监控设备包括型号,六个土壤感官巢和径流/交互收集系统。本文提出了一种案例研究了审判的建设。从项目中获得的信息将在评估当前的闭幕计划和对闭幕标准的绩效方面非常有价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号