Conducting Cost-Effectiveness Analysis of Cooling Water Use for 316(b) Compliance: J.H. Campbell Plant

机译:对316(b)份规定的冷却用水量进行成本效益分析:J.H.坎贝尔植物

获取原文

摘要

The Phase II 316(b) rule addresses impingement mortality and entrainment (I&E) standards for existing power plants that use more than 50 million gallons per day of cooling water. The now remanded rule required that certain plants reduce impingement by 80 to 95 percent and entrainment by 60 to 90 percent from a calculation baseline. Recent events in 316(b) regulation indicate that the cost of non-consumptive water use at steam-electric generation plants is likely to increase. In particular, more stringent requirements with respect to the impingement (trapped on intake screen) and entrainment (drawn through power plant) of aquatic organisms means that reducing the amount of water pumped could have a high value in offset technology spending costs.
机译:第二阶段316(b)规则解决了现有发电厂的强调死亡率和夹带(I&e)标准,该工厂使用每天5000万加冷却水的5000万加仑。现在还有规则要求某些工厂将40%降至95%的植物,并从计算基线夹带60%至90%。 316(b)条规定的最新事件表明,在蒸汽发电厂的非消耗用水成本可能会增加。特别是,关于冲击(摄取进气屏幕)的夹带(捕获)和夹带(通过发电厂)的水生生物的夹带(绘制通过发电厂)意味着减少泵浦的水量可以具有高价值的抵消技术支出成本。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号