Efficiency Tests on Ludvika Hydropower Station

机译:Ludvika水电站效率试验

获取原文

摘要

The tests showed that in-situ absolute efficiency testing of a small machine, 3500 kW, can be done within reasonable cost and with good accuracy thus may encourage the industry to perform such tests to a larger extent. Efficiency tests were conducted after refurbishment of the hydropower station. Vattenfall Power Consultant performed the tests and the Accusonic method was used for flow measurements on the Kaplan turbine directly coupled to a synchronous generator. Eight (8) paths of ultra-sound beams were used. The same method was used successfully in 1993 on a 750 kW machine with Francis turbine owned by Vasterbergslagens Kraft. It is tempting for suppliers of small hydropower machines to claim higher efficiency than can be obtained in reality as the cost of verification of a small machine is relatively high. At evaluation of bids, efficiency was evaluated as a major factor based on values derived from prognoses on future electricity production prices. The tests were performed as to verify the supplier-claimed efficiency values of the contract. This was to assure that Vasterbergslagens Kraft is awarding contracts only to serious vendors.
机译:该测试表明,原位绝对效率测试,3500 kW,可以在合理的成本和良好的准确度下进行,因此可能会鼓励行业在更大程度上进行这种测试。在水电站翻新后进行效率试验。 Vattenfall Power Consultant进行了测试,并且对该Accusonic方法用于直接耦合到同步发电机的Kaplan涡轮机上的流量测量。使用八(8)个超声波梁的路径。在1993年,在750千瓦机上成功使用了相同的方法,该机器与Vasterbergslagens牛皮纸拥有的弗朗西斯涡轮机。它很诱人的小型水电机的供应商来申请更高的效率,而不是实际上可以获得的,因为小机器的验证成本相对较高。在评估出价时,效率被评估为基于对未来电力生产价格中预期的价值的主要因素。进行测试,以验证合同的供应商索赔的效率值。这是为了确保Vasterbergslagens Kraft仅向严肃的供应商授予合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号