首页> 外文会议>HydroVision Conference >TMWA Powerhouse Modernization
【24h】

TMWA Powerhouse Modernization

机译:TMWA Powerhouse现代化

获取原文

摘要

Truckee Meadows Water Authority (TMWA) has four hydroelectric projects located just west of Reno, Nevada along Interstate 80 as you exit Nevada and start into California. The projects all utilize water from the Truckee River whose headwaters flow from Lake Tahoe. The projects were originally built around the turn of the century (20th!) and are each in the 2-3 MW range of output. For the past 15 years, TMWA has been progressing on an upgrade plan to modernize the projects. The modernization has been driven by events and factors that have been and are continuing to pose an issue for many generation groups. Some of the primary drivers have been: the requirement to separate generation from transmission and distribution (all of the projects were previously owned and operated by Sierra Pacific Power - Nevada Power); failure of antiquated equipment; an aging workforce; the ongoing demand to "do more with less"; as well as a forward-looking view of the need to modernize their aging system to make ongoing operation and maintenance easier. The upgrading started in 1992, with the help of Phoenix Power Control, Inc. The first plant underwent a complete controls and excitation upgrade. There was a long period of just maintaining but the pace of change has recently accelerated with two other plants undergoing upgrades in the span of about 3 years. The last project a complete electrical upgrade including controls, excitation, protection and the medium-voltage subsystem.
机译:Truckee Meadows Water Directory(TMWA)有四个水力发电项目,位于内华达州内华达州内华达州州内华达州际公路西部,当您退出内华达州并开始进入加利福尼亚州。该项目所有这些项目都利用了来自Truckee River的水,其前处从湖泊湖流流动。该项目最初是在世纪之交(第20届!)围绕(20号)建立的,并且每个输出中的2-3兆瓦输出。在过去的15年里,TMWA一直在进行升级计划来现代化项目。现代化是由事件和因素驱动的,并继续为许多一代人群提出问题。一些主要的司机已经是:要求从传输和分配中分开一代(所有项目以先前拥有和运营的塞拉太平洋 - 内华达电力);装箱失败;老龄化劳动力;正在进行的要求“更少的人做得更多”;除了前瞻性看起来,需要使老化系统进行现代化,使操作和维护更容易。升级在1992年开始,借助Phoenix Power Control,Inc。第一工厂经历了完整的控制和激励升级。只有很长一段时间只是维持,但最近的变化步伐最近加速了在大约3年的跨度中升级的另外两家植物加速了。最后一个项目完整的电气升级,包括控制,激励,保护和中压子系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号