首页> 外文会议>Power Plant Air pollutant Control "MEGA" Symposium >Multi-Pollutant Control Project at Cholla Unit 4
【24h】

Multi-Pollutant Control Project at Cholla Unit 4

机译:Cholla单元4的多污染物控制项目

获取原文

摘要

The 380 MW Unit 4 at the Cholla Station, which is owned by PacifiCorp and operated by Arizona Public Service, is the site of an ongoing full-scale multi-pollutant control project featuring several unique features. The goals of the project are to simultaneously implement modifications to reduce emissions of particulate and SO_2 while providing improved inherent mercury control and capability for further mercury reductions. This paper will provide an update on the progress of the project, including the replacement of a hot-side electrostatic precipitator with a pulse-jet fabric filter, installation of a wet lime FGD system utilizing inhibited oxidation, significant upgrades to the existing lime reagent preparation and waste slurry disposal systems, and conversion of the existing stack to accommodate operation in the "wet stack" mode. Performance test data will be incorporated and discussed.
机译:Cholla Station的380 MW单元4由Pacififorp拥有并由亚利桑那州公共服务运营,是一个具有几个独特功能的持续全面的多污染物控制项目的网站。该项目的目标是同时实施以减少微粒和SO_2排放的修改,同时提供改善的固有汞控制和进一步汞的能力。本文将提供有关该项目进度的更新,包括用脉冲喷射织物过滤器更换热侧静电除尘器,使用抑制氧化的湿石灰FGD系统,对现有的石灰试剂制剂进行显着升级和废弃浆料处理系统,以及现有堆栈的转换,以适应“湿堆”模式的操作。将结合和讨论性能测试数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号