首页> 外文会议>IASTED Africa Conference on Water Resource Management >A LONG-TERM PLANNING-BASED APPROACH TO SUSTAINABLE STORMWATER MANAGEMENT IN THE UK
【24h】

A LONG-TERM PLANNING-BASED APPROACH TO SUSTAINABLE STORMWATER MANAGEMENT IN THE UK

机译:基于长期规划的普通风暴卫水管理方法

获取原文

摘要

This paper explores the relationship between increased urbanisation and subsequent capacity problems within drainage infrastructure. The respective merits of resolving these problems using: i.) 'quick fix' engineered solutions; and ii.) long-term 'planning-based' remedial measures are investigated. The 'quick fix' approach would typically involve the provision of in-sewer storage (e.g. a storage chamber or oversized sewer pipes) to store excess flows, releasing them back into the sewer later for subsequent conveyance to an outfall. SUDS retrofitting appears to represent an attractive alternative to this 'hard engineering' approach, but has proved to be difficult to implement within the current UK regulatory environment. The 'planning-based' approach, on the other hand, might involve the imposition of 'green-field', or stricter, runoff restrictions to all new planning proposals submitted for urban sites (both new-build and brown-field redevelopment) - with a view to incrementally reducing the storm-water runoff entering the system over time. These issues are illustrated in relation to a UK case study that contains known 'surface water' flooding problems. Historical maps are used to demonstrate how the catchment has become increasingly urbanised over the last 50 years; and a simple modelling exercise demonstrates how this process has been directly responsible for exacerbating the catchment's flooding problems. The case study also demonstrates practical opportunities for reducing/resolving the flooding problems with both 'quick fix' engineered solutions, retrofit options, and long-term 'planning-based' remedial measures.
机译:本文探讨了排水基础设施中增加城市化与随后产能问题之间的关系。解决这些问题的各自优点:i。)'快速修复'工程解决方案;和II。)调查了长期“规划的”补救措施。 “快速修复”方法通常涉及提供内水储存(例如储存室或过大的下水道管)来存储过量流动,以后将它们释放回下水道以随后输送到排水口。苏打改造似乎代表了这种“艰苦工程”方法的有吸引力的替代方案,但证明难以在当前的英国监管环境内实施。另一方面,“基于规划的”方法可能涉及对城市网站提交的所有新规划提案的“绿地”,或更严格,径流限制的判断(既有新建和棕色领域重建) - 以逐步逐渐减少雨水径流,随着时间的推移进入系统。这些问题是关于含有已知的“地表水”洪水问题的英国案例研究。历史地图用于展示在过去50年内如何越来越多的城市集水区;并且简单的建模练习演示了这一过程如何直接负责加剧集水区的洪水问题。案例研究还展示了在“快速修复”工程解决方案,改造方案和基于长期的“规划”的补救措施中减少/解决洪水问题的实用机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号