首页> 外文会议>Coal-Gen Conference Exhibition >Fuel Cost Savings through Pulverizer Performance Upgrades at the St. Johns River Power Park
【24h】

Fuel Cost Savings through Pulverizer Performance Upgrades at the St. Johns River Power Park

机译:通过圣约翰河河河电力公园的粉碎机性能升级节省燃料成本

获取原文

摘要

The St. Johns River Power Park (SJRPP) is a two-boiler, 2 × 660 MW station that is jointly owned by JEA (formerly Jacksonville Electric Authority) and Florida Power & Light (FPL). JEA is the plant operator. These Foster Wheeler boilers, started up in 1987 and 1988, were each equipped with 7 OEM vertical spindle pulverizers feeding 28 OEM low NO_x burners in an opposed, wall-fired configuration. Since 2005, the boilers typically fire a blend of 70% Colombian coal (or, to a lesser degree, domestic coal) and 30% delayed petroleum coke.
机译:圣约翰河河(SJRPP)是一家双锅炉,2×660 MW站,由JEA(前杰克逊维尔电力管理局)和佛罗里达电力和光线(FPL)共同拥有。 JEA是植物运营商。 这些扶手锅炉于1987年和1988年启动,每个都配备了7个OEM垂直主轴粉碎机,以相对的壁式配置送入28个OEM低NO_X燃烧器。 自2005年以来,锅炉通常会发射70%哥伦比亚煤(或以较小程度,国内煤炭)和30%延迟石油焦炭的混合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号