首页> 外文会议>International Association of Drilling Contractors and Society of Petroleum Engineers Drilling Conference and Exhibition >Drilling for Coalbed Methane in the San Juan Basin With Coiled Tubing: Results, Learnings, and a World First
【24h】

Drilling for Coalbed Methane in the San Juan Basin With Coiled Tubing: Results, Learnings, and a World First

机译:钻井煤层在三胡南盆地钻孔,带有盘绕管:结果,学习和世界第一

获取原文

摘要

The San Juan basin is a prolific natural gas play in northwestern New Mexico and southwestern Colorado. It contains conventional oil and gas resources along with unconventional gas resources in the forms of tight gas and coalbed methane (CBM). Conventionally, drilling operations have been carried out by smaller rotary rigs with double or single derricks. These are usually minimalist, older rigs which fit well into the tight cost structure of the unconventional resources in the San Juan basin. In 2006, a coiled tubing drilling (CTD) pilot program was initiated in the San Juan basin consisting of seven wells, drilled in order of increasing complexity. The intention was to evaluate the full capabilities of CTD and its potential for use in the San Juan basin as well as the general U.S. onshore area. The drilling program included vertical wellbores, S-shaped wells off of a pad, and a horizontal sidetrack- all targeting the Fruitland Coal. In addition, several vertical and directional deep- set intermediate strings for future drilling of the deeper tight gas in the Mesa Verde and Dakota formations were set with CTD. The rig used was a new, custom-built, coiled tubing/rotary hybrid rig setup for use with large-diameter coiled tubing (3.5 in. and 2.875 in. OD). In addition, it had a single-sized derrick, rotary table and top-drive. This allowed the rig to drill with jointed pipe, handle and make-up bottomhole assemblies (BHA), and run liner and casing. Problems were encountered in areas such as fluid and additive selection, bit selection, hole stability issues, and crew training and rig limitations. In addition, CTD in this format was new to the San Juan basin and its personnel. Further issues that added difficulty included maintaining stringent standards of safety and environmental compliance, as well as conducting worldfirst operations such as running a rotary-steerable system (RSS) on coiled tubing. The end result was seven successfully drilled wells that are producing at the same or at better rates than offsets drilled with conventional rotary technology.
机译:圣胡安盆地是新墨西哥州西北部和科罗拉多州西南部的多产天然气。它含有常规的石油和天然气资源以及紧身煤层和煤层(CBM)形式的非传统气体资源。传统上,钻井操作已经通过具有双或单个井架的较小的旋转钻机进行。这些通常是简约的旧钻机,其适合于圣胡安盆地非常规资源的紧张成本结构。 2006年,在San Juan盆地中启动了一个盘绕的管道钻井(CTD)试点程序,该井组成,该井组成,按照复杂性的增加。目的是评估CTD的全部能力及其在圣胡安盆地以及美国陆上地区的普通地区的潜力。钻井计划包括垫子的垂直井筒,S形孔,以及水平的侧面,均瞄准成果煤。此外,使用CTD设定了几种用于未来钻孔的垂直和定向深层中间串,用于未来的MESA VERDE和Dakota地层钻孔。使用的钻机是一种新型,定制的卷绕管/旋转式混合钻机设置,用于大直径卷管(3.5英寸和2.875英寸OD)。此外,它还具有单尺寸的井架,旋转台和顶级驱动。这允许钻机用连接管,手柄和化妆底孔组件(BHA)钻孔,并运行衬垫和套管。在诸如流体和添加剂选择,比特选择,孔稳定性问题以及船员训练和钻机限制等领域遇到了问题。此外,这种格式的CTD是圣胡安盆地及其人员的新手。进一步的问题增加了难度包括维持安全和环境遵从性的严格标准,以及在卷绕管道上运行旋转可转向系统(RSS)等世界大道的操作。最终结果是七个成功钻出的井,其在与传统旋转技术钻取的偏移相同或更好地产生的井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号