The project schedule management model based on the program evaluation and review technique and Bayesian networks

机译:基于程序评估和审查技术和贝叶斯网络的项目进度管理模型

获取原文

摘要

Based on the analysis of program evaluation and review technique (PERT) and bayesian network, a PERT bayesian network (PERTBN) is built according to the basic requirement of project schedule management. Fistly, a basic model of PERTBN is established, and the node types and the simplifying method of the model are detailed. Secondly, based on the three process arrangement modes of single-chain, centralized and distributed types, the corresponding PERTBN modeling methodology is put forward respectively. Subject to the time sequence dependence of the immediate predecessor nodes and the immediate successor nodes, the calculation methods of the conditional probability distribution of each node are determined. At last, with the analysis of the basic attribute and features of PERTBN, the applicable future in the combination of PERT and bayesian network in the project schedule management is shown.
机译:根据方案评估和审查技术(Pert)和贝叶斯网络的分析,根据项目计划管理的基本要求,建立了一个Pert Bayesian网络(Pertbn)。施说,建立了PerTBN的基本模型,并且详细介绍了该模型的节点类型和简化方法。其次,基于单链,集中和分布式类型的三种过程布置模式,分别提出了相应的PERTBN建模方法。受到直接前任节点和立即接班室节点的时间序列依赖性的影响,确定每个节点的条件概率分布的计算方法。最后,通过分析Pertbn的基本属性和特征,显示了项目进度管理中Pert和贝叶斯网络组合的适用的未来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号