首页> 外文会议>International Conference of Nonferrous Materials >Life cycle inventory for base metal ingots production in Japan including mining and mineral processing processes by cost estimating system database
【24h】

Life cycle inventory for base metal ingots production in Japan including mining and mineral processing processes by cost estimating system database

机译:日本基础金属锭生产的生命周期库存包括通过成本估算系统数据库的挖掘和矿物加工过程

获取原文

摘要

CO{sub}2 emission levels of copper and zinc mines from which Japanese smelters import ore concentrates into Japan, were estimated by using a database called MLED. Eleven copper mines selected from data availability of mine site covered 84% of the total imported concentrates. Adding inventories of sea transportation and smelting processes to mine development process, total CO{sub}2 emission level for copper and zinc ingots produced in Japan were calculated. The results show that the emission share of mining and mineral processing processes for each mine is indicated around 30%-70% of total emission for ingots, which implies the importance of including the mining activities to the inventory of upper stream products.
机译:通过使用称为MLED的数据库估算了日本冶炼厂导入矿石的铜和锌矿的2个发射水平。从DEA PINE的数据供应中选择11个铜矿占进口总浓缩物的84%。计算海运库存及日本生产的铜和锌锭的总共{Sub} 2排放水平。结果表明,每个矿井采矿和矿物加工过程的排放份额显示为锭总排放量约为30%-70%,这意味着将采矿活动包括在上流产品库存中的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号