首页> 外文会议>International Conference on Electrical Power Quality and Utilisation >Requirements for a modern PQ and DFR monitoring system: PQ monitoring case study in Portugal
【24h】

Requirements for a modern PQ and DFR monitoring system: PQ monitoring case study in Portugal

机译:现代PQ和DFR监测系统的要求:葡萄牙的PQ监测案例研究

获取原文
获取外文期刊封面目录资料

摘要

There are many manufacturers around the world providing power quality (PQ) monitoring and digital fault recording (DFR) solutions. Different monitoring requirements, monitoring practices, and new standardization make for a diverse range of available solutions. The first section of the paper will summarize the requirements and challenges of a modern PQ and DFR monitoring system. The second section will be a case study about the Qualitrol and Qenergia' systems implemented in Portugal, particularly at EDP and REN; it will show what has been done. Until IEC 61000-4-30 [1] was introduced in 2003 many power quality parameters were not well defined leading to situations where different instruments produced different results. In 2008 Edition 2 was introduced and Edition 3 is now in progress. As well as considering 61000-4-30, this paper will summarize the key requirements of the new upcoming IEC 62586 [2] product standard for power quality monitoring devices. In the second section of the paper we will present how to manage grid measuring points whose characteristics change over time, rather than just manage a fleet of measuring instruments. We will discuss the way to make compatible different types of measurement devices, access different data sources, handle the standards changes both in the limit values and in the way values are calculated and validate PQ and event data. Different ways of representing power quality information will also be addressed. Presenting information and not just raw data from the monitoring system is essential for efficient management of reports for regulatory and third party use. The Qualitrol and Qenergia's systems at EDP and REN have been developed to suit existing communication infra structure, automatic and manual data retrieval and integrate in a single software analysis package, in a multi-vendor way, already existing older PQ devices together with new instruments. Combining PQ and DFR data also leads to efficiencies when collecting and an- - alyzing results.
机译:全球有许多制造商提供电力质量(PQ)监控和数字故障录制(DFR)解决方案。不同的监控要求,监控实践和新标准化为各种可用解决方案提供了多种可用解决方案。本文的第一部分将总结现代PQ和DFR监测系统的要求和挑战。第二部分将为葡萄牙实施的Qualitrol和Qenergia的系统进行案例研究,特别是在EDP和Ren;它将显示已完成的内容。直到2003年IEC 61000-4-30 [1]介绍,许多电能质量参数并没有明确定义,导致不同仪器产生不同结果的情况。 2008年版本2被介绍,版本3现在正在进行中。除了考虑61000-4-30,本文将总结电力质量监测设备新型IEC 62586 [2]产品标准的关键要求。在本文的第二节中,我们将介绍如何管理其特征随时间变化的网格测量点,而不是管理队列测量仪器。我们将讨论兼容不同类型的测量设备,访问不同的数据源,处理标准在限制值和验证PQ和事件数据的方式中更改的方法。还将解决代表电能质量信息的不同方式。呈现信息,而不仅仅是来自监测系统的原始数据对于有效管理报告的监管和第三方使用的报告至关重要。 EDP​​和REN的Qualitrol和QEnergia的系统已经开发出来,以适应现有的通信Infra结构,自动和手动数据检索,并以多供应商方式在单一的软件分析包中集成,已将较旧的PQ设备与新仪器一起使用。结合PQ和DFR数据也会在收集和α-alezing结果时导致效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号