首页> 外文会议>Sino-Japan Geotechnical Symposium >FINITE ELEMENT SIMULATION OF A TRIPLE-FACE SHIELD TUNNELLING
【24h】

FINITE ELEMENT SIMULATION OF A TRIPLE-FACE SHIELD TUNNELLING

机译:三脸盾构隧道的有限元仿真

获取原文

摘要

During shield tunnelling operation, a shield tunnelling machine is driven forward by applying mechanical jack forces behind the shield machine tail and excavating the soil in front of the shield machine with its cutting face. In this study, the advancement and excavation processes of the shield tunnelling operation are modelled using the finite element method in order to investigate the effect of these construction processes on the ground response. An excavating finite element, which models the disturbed soil in front of the cutting face, is introduced. The operation of shield advancement and of soil excavation is simulated using the finite element remeshing technique at each time step of the analysis.The proposed modelling techniques of shield tunnelling construction is applied to simulate a triple-face shield tunnelling work in Tokyo and the numerical results are compared with the field measurements.
机译:在屏蔽隧道操作期间,通过在屏蔽机尾部后面的机械插孔和挖掘屏蔽机前面的土壤和切割面上挖掘土壤来促进屏蔽隧道机。在该研究中,使用有限元方法建模屏蔽隧穿操作的进步和挖掘过程,以研究这些施工过程对地面响应的影响。介绍了挖掘有限元件,其模拟切割面前面的干扰土壤。使用有限元回忆技术在分析的每步进行模拟屏蔽进步和土壤开挖的操作。应用屏蔽隧道结构的建模技术应用于模拟东京的三面盾构隧道工作和数值结果与现场测量进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号