首页> 外文会议>International Conference on Product Innovation Management >A study of power plant construction project post-evaluation system based on the future orientation
【24h】

A study of power plant construction project post-evaluation system based on the future orientation

机译:基于未来取向的电厂建设项目延期评价体系研究

获取原文

摘要

Power Plant Construction project plays a very important role in ensuring the national economic and social development, promoting industrial structure adjustment and optimizing the allocation of resources, while post project evaluation is a vital sector and link as well to test whether Power Plant projects achieve the construction goal and benefit effect. Through analyzing and research the existent problems in evaluation process, contents and methods of post project evaluation, combing a case to illustrate the application and advantages of the process, this article provides a evaluation system that based on the future orientation. This system, not only offers support of methodology for improvement of built projects, also can provide a reference during feasibility study and implementation process of new projects.
机译:电厂建设项目在确保全国经济和社会发展中发挥着一种非常重要的作用,促进产业结构调整和优化资源分配,而项目岗位评估是一个重要的部门和联系,也可以测试电厂项目是否实现了建设 目标和效益效果。 通过分析和研究了评估过程中存在的问题,项目评估的内容和方法,梳理案例来说明该过程的应用和优势,本文提供了基于未来方向的评估系统。 该系统不仅为改进内置项目提供了对方法的支持,还可以在可行性研究和新项目的实施过程中提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号