The Reline of ROGESA's No. 4 Blast Furnace in 2016: Technical Upgrades Performed During the Revamping Project

机译:2016年Rogesa的4号高炉Reline:在改造项目期间执行的技术升级

获取原文

摘要

After 90 days of stoppage, ROGESA's blast furnace n°4 started its fifth campaign on the 29th of September, 2016. With a hearth diameter of 11.2 meters, its daily target hot metal production is 6,500 tons. During the plant reline, important modernizations have been implemented. Extended charging flexibility, an optimized BF profile, the cooling elements design and arrangement, as well as improved hearth monitoring will support both a better process efficiency and reaching the target of a 15-years campaign. The solutions for the hot blast generation and supply systems will contribute to the necessary process stability. A modern top gas cleaning concept reduces the output of critical BF sludge and thus the environmental impact of the blast furnace operations.
机译:经过90天的停机后,Rogesa的高炉B°4°4°在2016年9月29日开始第五次竞选活动。由于壁炉直径为11.2米,其日常的热金属产量为6,500吨。在植物中,已经实施了重要的现代化。扩展充电灵活性,优化的BF型材,冷却元件设计和布置,以及改进的炉膛监控将支持更好的过程效率并达到15年的活动目标。热爆发和供应系统的解决方案将有助于必要的过程稳定性。现代气体清洁概念减少了临界BF污泥的输出,从而降低了高炉操作的环境影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号