首页> 外文会议>Society of Petroleum Engineers International Thermal Operations and Heavy Oil Symposium >Impact of Operational Parameters and Reservoir Variables During the Startup Phase of a SAGD Process
【24h】

Impact of Operational Parameters and Reservoir Variables During the Startup Phase of a SAGD Process

机译:SAGD过程中启动阶段运行参数和储层变量的影响

获取原文
获取外文期刊封面目录资料

摘要

This paper highlights how numerical simulation can be used as a tool to optimize the start-up phase of a SAGD process. During start-up,the main objective is to create a uniform communication path between the two wells by first circulating steam in both the injector and the producer well and then imposing a differential pressure between them.The dynamics of this process leads to important temperature and pressure transients that should be carefully considered when developing a start-up strategy.Usually,this start-up strategy aims at minimizing the time in which the well pair can be converted to full SAGD operation without causing any adverse effects on the long-term process performance.
机译:本文突出了数值模拟如何用作优化SAGD过程的启动阶段的工具。在启动期间,主要目的是通过在喷射器和生产者中的第一循环蒸汽在喷射器和生产者中产生均匀的通信路径,然后在它们之间施加差压。该过程的动态导致重要的温度和在开发启动策略时应仔细考虑的压力瞬变。通常,此启动策略旨在最大限度地减少井对可以转换为完全SAGD操作的时间,而不会导致对长期过程的任何不利影响表现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号