Infrastructure Rehabilitation Management Applying Life-Cycle Cost Analysis

机译:基础设施康复管理应用生命周期成本分析

获取原文

摘要

Engineers and researchers have focused on developing materials, methodologies for new buildings and construction in recent years. There is not enough attention devoted to infrastructures that have been constructed. The aim of this paper is to present a decision-making framework system for selecting an optimal structural rehabilitation alternative for infrastructure systems considering sustainability. Emphasis is placed on how to properly decide the degree of end users' second-time investment of their structures implementing life cycle costing. Life-Cycle Cost (LCC) Analysis has not reached maturity and therefore has not yet become a standard method that can be implemented universally. This paper presents a user-friendly spreadsheet application demonstrating that the Life-Cycle Cost Analysis can be performed with very minimal input. On the sensitivity study of the model, it is concluded that the discount rate has minor impact on the rehabilitation decisions once the discount rate is greater than 7% and the rehabilitation timing is crucial to a successful saving. The proposed spreadsheet package provides the engineers and owners with a quantifiable, close-form solution for selecting rehabilitation alternatives with very minimal input information required.
机译:工程师和研究人员专注于近年来开发材料,新建筑方法和建设。没有足够的重视,专门用于建造的基础设施。本文的目的是提出一种决策框架系统,用于选择考虑可持续性的基础设施系统的最佳结构康复替代品。重点是如何正确决定最终用户的第二次投资,其结构实现生命周期成本。生命周期成本(LCC)分析尚未达到成熟,因此尚未成为普遍实施的标准方法。本文介绍了用户友好的电子表格应用程序,演示了可以使用非常最小的输入执行生命周期成本分析。在模型的敏感性研究中,一旦折扣率大于7%,折扣率对康复决策的次要影响很小,并且康复时序对于成功储蓄至关重要。建议的电子表格包为工程师和业主提供了一种可量化的闭形件解决方案,用于选择具有非常最小的输入信息的康复替代品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号