首页> 外文会议>Society of Petroleum Engineers Annual Technical Conference and Exhibition >Solid Expandable Liner System With Custom Composite Frac Plugs Enable Recovery Of Lost Reserves In The Piceance Basin
【24h】

Solid Expandable Liner System With Custom Composite Frac Plugs Enable Recovery Of Lost Reserves In The Piceance Basin

机译:具有定制复合FRAC插头的可稳固可扩展衬里系统,可在皮克西池中恢复丢失的储备

获取原文

摘要

Casing integrity failure, whether through parted casing, leaky collars or some other issue, may result in less effective stimulation work due to abandonment of the plug and perf method and/or having to complete through a frac liner. In more extreme cases it could result in lost reserves below the casing failure point. Modern technology has provided a cost effective solution to this problem. In this case, the operator confirmed parted 4-1/2 inch production casing at 9,761 feet (Fig. 1) in their northern Piceance Basin acreage. The operator would have to repair the parted casing in order to frac the lower six zones of the well. The plug & perf method for zonal isolation was required to effectively complete the 2,825 foot vertical pay interval. In order to complete the stimulation program, the goal was to repair the short section of damaged casing and restore pressure integrity to the well while maintaining a sufficient inner diameter (ID) to allow composite frac plugs to pass through the repair and set in the base casing's larger ID below the split. After a corrugated patch failed to provide casing integrity, the solution was a 3- 1/2 inch single-joint solid expandable system that was expanded downhole to cover and seal the parted 4-1/2 inch casing in conjunction with the use of custom made composite frac plugs. The 30-ft., 3-1/2 inch solid expandable high-pressure, high-temperature (HPHT) liner system was deployed and expanded in a single trip. This system provided the required pressure integrity to withstand the frac pressures needed in this area. The 3.261 inch drift ID of the expanded solid liner allowed the operator to run custom 3.06 inch outer diameter (OD) composite frac plugs below the repaired section and successfully complete the well. This installation was a success, as the operator had essentially written off 63% of the well's reserves due to the casing part occurring above a majority of the pay interval. The operator is now realizing full production from the entire well. Moreover, this single-joint solid expandable liner technology coupled with the special drillable composite frac plugs can be used in any HPHT formation to repair the common issue of damaged casing to allow plug and perf completions to continue.
机译:套管完整性失败,无论是否通过分开的套管,漏水项圈或其他一些问题,可能导致避免塞子和完善方法和/或必须通过FRAC衬里完成较少的刺激工作。在更极端的情况下,它可能导致壳体故障点以下的储量损失。现代技术为此问题提供了成本效益的解决方案。在这种情况下,操作员确认在北iceance盆地面积上的9,761英尺(图1)处于9,761英尺(图1)中的分配4-1 / 2英寸的生产套管。操作员必须修理分割的套管,以便Frac井的六个区域。需要有效地完成2,825英尺垂直工资间隔所需的插头和完善的方法。为了完成所述刺激程序,目标是修复受损的外壳的短部分和恢复压力完整性,以及同时保持足够的内径(ID),以允许复合压裂塞穿过基座中的维修和集套管在分裂下方的较大ID。在波纹贴片未能提供套管完整性之后,溶液是3-1/2英寸单关节固体可扩展系统,井下膨胀以覆盖并密封分离的4-1 / 2英寸壳体,与使用定制使用制成复合FRAC插头。 30英尺,3-1 / 2英寸固体可扩展的高压,高温(HPHT)衬里系统在一次行程中展开并扩展。该系统提供了所需的压力完整性,以承受该区域所需的Frac压力。 3.261英寸膨胀衬垫的漂移ID允许操作员在修复的部分下方运行定制3.06英寸外径(OD)复合FRAC插头,并成功完成井。此安装是取得成功的,因为由于壳体部分在大多数付费间隔上方发生的壳体部分,操作员基本上写了63%的井储备。操作员现在从整个井中实现全部生产。此外,与特殊可钻头复合FRAC插头相结合的这种单关节固体可扩展衬垫技术可用于任何HPHT形成,以修复损坏的套管的常见问题,以允许插头和完井完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号