First Intelligent Well Completion in the Troll Field Enables Feed-Through Zonal Isolation: A Case History

机译:在Troll字段中首次智能井完成使馈通区域孤立能够:案例历史

获取原文

摘要

Statoil operates the Troll Field in the Norwegian Sector of the North Sea and wished to run a deep sidetrack from the mother bore in a multilateral well that would exit through the 10-3/4-in. liner in the reservoir. The plan would have to address several new challenges, including an intelligent completion that would offer zonal isolation for four zones and dual pressure and temperature for all oil zones; these were not usual requirements for the standard multilateral wells in the field. Statoil had evaluated several zonal-isolation methods, and based on previous experience, they decided to use swellable packer technology. Since this would be the first intelligent-well completion in Troll field and the first ever for Statoil using feed-through swellable packers, a full scale test to qualify the technology was required. Swelling and differential-pressure tests were initiated using oil from the Troll field. Testing revealed that this type of completion actually would exceed the necessary requirements. The lower completion was designed with 7-in. inflow-control-device (ICD) mesh screens and three openhole swellable packers to isolate the reservoir into three separate oil zones and to separate the gas cap. The inner completion string was designed with three dual gauges, three 3-1/2-in. feed-through swellable packers, three 3-1/2-in. hydraulic flow-control valves, and a hydraulically operated gas-lift valve below the production packer to allow natural gas lift. The installation was performed from a semi-submersible rig without an HSE incident and ahead of plan. The well was put on production shortly thereafter, and zonal isolation was confirmed by selective closure of the flow-control valves. The paper will discuss the swellable packer design, qualification testing, planning, installation, and the results of this intelligent completion, which was the first in the Troll Field.
机译:Statoil在北海的挪威行业中运营巨魔领域,并希望从母孔中沿着母孔的深层侧身,这将在10-3 / 4进入。衬里在水库中。该计划必须解决几个新的挑战,包括智能完成,可以为四个区域提供区域隔离和所有油区的双压力和温度;这些不是现场标准多边井的常规要求。 Statoil已经评估了几种局部隔离方法,并根据以前的经验,他们决定使用可稳定的包装机技术。由于这将是Troll Field中的第一个智能良好的完成,并且使用馈电可膨胀的封装器的第一个旨在的速率稳定,因此需要满足符合符合技术的尺度测试。使用来自巨杆场的油启动肿胀和差压试验。测试表明,这种类型的完成实际上将超过必要的要求。完成较低的完成设计为7英寸。流入控制装置(ICD)网格屏幕和三个透明封装机将水库分成三个独立的油区并分离气体盖。内完成串设计有三个双仪,三个3-1 / 2英寸。馈通可膨胀的封隔器,三个3-1 / 2英寸。液压流量控制阀和生产封隔器下方的液压燃气升降阀,以允许天然气升力。安装是从半潜式钻机进行的,没有HSE事件,并在计划之前。此后不久的井被提出,通过选择性封闭流量控制阀来确认区域隔离。本文将讨论可膨胀的包装机设计,资格测试,规划,安装以及这种智能完成的结果,这是Troll领域的第一个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号