IS COMMISSIONING ONCE ENOUGH?

机译:调试一次吗?

获取原文

摘要

The Energy Systems Laboratory has developed a commissioning process called Continuous Commissioning over the last decade. This process is used to resolve operating problems, improve comfort, optimize energy use, and sometimes to recommend retrofits. The process has produced average energy savings of about 20% without significant capital investment in over 150 large buildings in which it has been implemented. Payback has virtually always been under 3 years with two years or less in most buildings. This paper describes the process and presents a case study that explicitly shows the value of follow-up consumption tracking and commissioning. Examination of 20 building-years of heating and cooling consumption data from commissioned buildings found an overall increase in heating and cooling of 12.1% over two years. Almost 75% of this increase was caused by significant component failures and/or control changes that did not compromise comfort, but caused large changes in consumption. The remainder was due to control changes implemented by the operators. This data does not explicitly answer the question "When is follow-up commissioning needed?", but strongly suggests that follow-up commissioning is needed when consumption tracking shows that significant increases in consumption have occurred.
机译:能源系统实验室已开发出一个调试过程,该过程在过去十年中被称为连续调试。此过程用于解决操作问题,提高舒适性,优化能源使用,有时建议改装改装。该过程产生了大约20%的平均节能,而在超过150个大型建筑物的情况下,它已经实施了大幅资金投资。回报几乎在大多数建筑物中几乎始终在3年内持续3年。本文介绍了该过程,并提出了一个明确显示随访消费跟踪和调试价值的案例研究。委托建筑的20个楼宇加热和冷却消耗数据的检查发现,两年以上的加热和冷却的总体增加12.1%。这一增长的近75%是由显着的组成故障和/或控制变化,并不妥协的变化,而是导致消费的巨大变化。其余的是由于运营商实施的控制变更。此数据不会明确回答“需要后续调试时的问题?”,但强烈建议在消费跟踪显示出现显着增加时,需要进行后续调试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号