首页> 外文会议>International oil spill conference >THE LAKE BARRE OIL SPILL NRDA: FROM RESPONSE TO RESTORATION
【24h】

THE LAKE BARRE OIL SPILL NRDA: FROM RESPONSE TO RESTORATION

机译:Barre Lake Oil Spill NRDA:从回复恢复

获取原文

摘要

A release of approximately 6,561 barrels of crude oil from a Texaco pipeline into Lake Barre in May 1997 injured marsh, birds, and aquatic fauna. Texaco was proactive in dealing with the trustees in the Natural Resource Damage Assessment NRDA) process and stayed directly involved throughout; resulting in a cooperative assessment. The trustees focused quickly on the key injuries that required assessment. There was early agreement to conduct a cooperative, restoration-based NRDA, and to design field studies for the injured marsh to provide inputs for scaling using habitat equivalency analysis (HEA). It also was agreed that for this incident, field studies to assess bird and aquatic faunal injury would not be cost-effective or likely improve the accuracy of injury estimates. Although agreement on a common quantification approach for faunal injury was not reached, the two sides agreed on how much restoration was appropriate. The parties developed an extensive list of restoration alternatives, and although the trustees retained the final decision making authority, there were no significant disagreements on how various alternatives ranked according to restoration selection criteria. The selected project is planting saltmarsh vegetation on platform of dredged material placed on East Timbalier Island by the Coastal Wetland Planning, Protection, and Restoration Act (CWPPRA) program. No CWPPRA funds were available for planting. In scaling the restoration, Texaco will only get credit for the ecological services provided by their planting above that which would occur in the absence of planting. Factors such as erosion rates expected with and without planting and the rate of natural colonization of marsh in the absence of planting were considered in the scaling calculations. The trustees and Texaco jointly briefed attorneys for both sides throughout the NRDA process, but were not active participants in meetings regarding technical matters. These briefings ensured a quick transition from the injury assessment and restoration project selection process to settlement negotiations. A consent decree was lodged with the court in September 1999. Texaco will implement the restoration and the monitoring plan, and pay all trustee assessment and restoration oversight costs as part of the settlement.
机译:1997年5月,从德克萨哥管道释放了大约6,561桶原油的原油,于1997年5月受伤的沼泽,鸟类和水生动物。 Texaco积极主动地处理自然资源损害评估NRDA的受托人,并直接涉及整个;导致合作评估。受托人迅速关注所需评估的主要伤害。早期协议进行合作,恢复的NRDA,并为受伤沼泽设计实地研究,以提供使用栖息地等效分析(HEA)进行扩展的投入。它还同意为此事件进行评估,评估鸟类和水生群损伤的实地研究将不会具有成本效益或可能提高损伤估计准确性。虽然没有达到对群体伤害的常见量化方法的协议,但双方同意恢复多少是合适的。缔约方制定了广泛的恢复替代品清单,虽然受托人保留了最终决策权,但根据恢复选择标准如何排名的各种替代品没有重大分歧。所选项目正在沿海湿地规划,保护和恢复法案(CWPPRA)计划在东蒂巴尔岛上的疏浚物料平台上种植盐育植被。没有CWPPRA资金用于种植。在缩放恢复时,Texaco只会获得他们种植提供的生态服务的信贷,以至于在没有种植的情况下会发生这种情况。在缩放计算中考虑了在没有种植的情况下预期的侵蚀率和沼泽的自然定植率等因素被考虑在缩放计算中。在整个NRDA流程中,受托人和德克萨克共同介绍了双方的律师,但在会议上没有积极参与技术问题。这些简报确保了从伤害评估和恢复项目选择过程中快速过渡到结算谈判。 1999年9月与法院提出了同意法令。Texaco将实施恢复和监测计划,并将所有受托人评估和恢复监督成本支付,作为结算的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号