More Than 30 Years’ Experience With F(P)SO’s and Offloading Techniques

机译:超过30年的F(p)的经验所以和卸载技术

获取原文

摘要

TOTAL E&P Branch, present today in more than 43 countries and producing 2.6 Mboe/d, has steadily become an important player in the field of Floating (Production) Storage and Offloading facilities, key to several oil and gas field developments. The experience described below is the cumulated experience (upstream) from TOTAL, Petrofina and Elf Aquitaine who successfully merged in 1999 and 2000 to form TOTAL. As the reader will rapidly notice this experience is extremely rich and diversified and includes many maiden installations as well as technology breakthroughs. Some of them: - The Ifrikia (Ashtart field Tunisia 1973) was the first FSO (Floating Storage Unit, converted tanker) permanently moored by a rigid yoke on a CALM buoy, followed in 1978 by the Ifrikia II, the first purpose build FSO barge. - The Frigg flare (North Sea 1974) was the second Articulated Column. It followed an experimental articulated column installed in 1967 in the Bay of Biscay. - The first Ready Made Dolphin was installed on Quinfuquena (Angola 1979). - In the same year the first two turret type CALM buoys were installed on Mayumba (Gabon 1979), then Kole (Cameroon 1979). - Three CALM type buoys of a new design using self lubricating bushing in lieu of main roller bearing, were ordered for Rospomare (Italy 1981), ABK (U.A.E 1981) and Victoria field (Cameroon 1982). - The Licorne Pacifique converted tanker on Palanca field (Angola 1984) was the third CALM soft-yoke (the first one was in 1981). - The first disconnectable FPSO soft mooring on a fixed tower was installed on Weizhou 10-3 field (Beibu Wan South China Sea P.R. China 1986). - The most southerly CALM installed in Hidra Tierra Del Fuego (Argentina 1987). - The second ever installed LPG FSO started operations on NKossa field in 1995 (Congo). - The first huge concrete FPU (Floating Production Unit) NKP was installed on spread mooring on NKossa field (Congo 1996) and using for the first time suction anchor piles in soft clay.
机译:今天在43多个国家/地区出现的E&P分支机构总数并制作2.6亿兆欧/ D,稳步成为浮动(生产)储存和卸载设施领域的重要人物,若干石油和天然气现场发展的关键。下面描述的经验是从1999年和2000年成功合并的总,Petrofina和Elf Aquitaine的累积体验(上游),以形成总数。随着读者迅速注意到这种经验非常丰富,多样化,包括许多未婚设施以及技术突破。其中一些: - Ifrikia(Ashtart Field Tunisia 1973)是第一个由一个刚性枷锁永久停泊的FSO(浮动储存单位,转换油轮),在一个平静的浮标上,1978年被Ifrikia II遵循,第一个目的构建FSO Barge 。 - Frigg Flare(北海1974)是第二个关节柱。它遵循一个在1967年安装在Biscay海湾的实验剖腹产。 - 第一个准备好的Dolphin安装在Quinfuquena(Angola 1979)上安装。 - 同年,第一个两个炮塔类型平静浮标安装在Mayumba(Gabon 1979),然后是Kole(喀麦隆1979)。 - 使用自润滑衬套的新设计的三种平静型浮标,代替主滚子轴承,被命令Rospomare(意大利1981),ABK(U.A.E 1981)和维多利亚野战领域(喀麦隆1982年)。 - Licorne Pacifique在Palanca Field(Angola 1984)上换上了油轮,是第三个平静的软轭(第一个1981年)。 - 固定塔上的第一个可断开的FPSO软停泊安装在Weizhou 10-3领域(Beibu Wan South China Sea P.R.China 1986)。 - 位于Hidra Tierra del Fuego(阿根廷1987)中安装的最南方的平静。 - 第二次安装的LPG FSO在1995年开始在NKOSSA字段上进行操作(刚果)。 - 第一个巨大的混凝土FPU(浮动生产单位)NKP安装在NKOSSA领域(刚果1996)的涂抹系泊上,并使用软粘土中的第一次吸入锚固桩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号