Practical issues in hydrologic modeling for flood management of watercourses running through urban environments in Greece

机译:通过城市环境在希腊城市环境中洪水管理水文建模的实际问题

获取原文

摘要

The traditional training method of watercourses with closed conduits applied some decades ago is no longer environmentally acceptable. Nowadays all such projects are required to get environmental permit before construction, the natural state of watercourses should be preserved; open cross sections and materials friendly to the environment such as gabions, should be used in most cases. Existing structures and upstream control should be integrated in the final layout. Recently, programs have developed in Europe, e.g. Ecoflood, Daywater, investigating the possibilities of control at the source and restoration of the floodplains. However, this is not always feasible in heavily urbanized areas and especially for high return period floods. Determination of design discharges is an important factor. Design for a given return period is not uniquely defined and may vary considerably depending on the selection of the parameters and methodologies involved. New guidelines require higher return period for the design. In the case of watercourses with ephemeral flow data for calibration are usually not available. Thus, increased urbanization, higher design return period and way of computation result in higher design discharges than before. It is considered necessary to assure that the final design can handle discharges higher than the design discharge with reduced freeboard and that critical points, such as road and highway crossings are designed to handle higher return period floods with safety. Sensitive points of existing closed sections to pressurized flow should be identified and protected. It is proposed that hydrologic models are used that give the time and spatial distribution of peaks along with lag time estimations similar to those proposed by the hydrographs given in the Design of Small Dams.
机译:与封闭管道水道的传统训练方法应用于几十年前就不再符合环保要求。现在,所有的这些项目都需要得到建设前的环境许可证,水道的自然状态应该被保留;开放的横截面和材料对环境友好,如石笼,在大多数情况下使用。现有的结构和上行控制应被集成在最终布局。近日,方案已在欧洲,例如开发Ecoflood,Daywater,调查控制在洪泛区的源极和恢复的可能性。然而,这并不总是在高度城市化地区尤其是高回报期洪水可行。设计排放的测定是一个重要因素。对于给定的重现期设计并不唯一地限定,并且可以根据所涉及的参数和方法的选择有很大的不同。新准则要求进行设计更高的回报期。在与校准短暂的流量数据水道的情况下通常是不可用的。因此,在更高的设计排放比以前增加了城市化,更高的设计重现期和方法的计算结果。它被认为是必要的,以确保最终的设计可以处理更高的放电比减少干舷设计流量和临界点,如道路和公路口岸旨在处理与安全回报率较高时期的洪水。现有的封闭部分加压流的敏感点应确定和保护。建议将水文模型所使用的给予时间和类似的在小水坝的设计给出的水文提出的延迟时间估计沿着山峰的空间分布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号