【24h】

The development of tube-well irrigation systems in Cambodia

机译:柬埔寨管井灌溉系统的开发

获取原文

摘要

The use of tube-wells for irrigating rice has been a recent development in several southern provinces in Cambodia. The first dedicated tube-well for irrigating rice was installed in the Prey Kebas district, Takeo province in 1995. During the next three years more than 1000 wells were dug and today it is estimated that between 2000 and 3000 wells are sourcing water from the underground aquifer near the Bassac River. Annual crop yields increased from 1.5 to 6 t ha~(-1) and annual financial returns from $100 to $550 ha~(-1). In 1999 the Cambodia-IRRI-Australia project conducted a tube-well survey monitoring 62 wells in a 1200 km~(-2) area in Kandal and Takeo provinces. Well depth was monitored every month for a 12-month period. This survey was repeated in 2002 to determine the effect that the increased use of tube-wells was having on the underground water level. The results followed a similar recharge and draw-down pattern for each year and indicated that the Bassac River was recharging wells up to 30 km to the west. It also showed that the maximum draw-down depth was about five metres, which is the limit from which centrifugal pumps can draw water. The results of this study provide information that may help authorities develop a policy on underground water usage in Cambodia.
机译:使用管井来灌溉水稻是柬埔寨几个南部省份的最新发展。 1995年,在毛田省卓越的Kebas区安装了第一家专用管井。在接下来的三年里,挖出了1000多个井,据估计,2000年至3000个井之间是来自地下的水源巴萨克河附近的含水层。年产量产量从1.5到6吨〜(-1)增加,年度财政收益从100美元到550美元〜(-1)。 1999年,柬埔寨 - Irri-Australia项目在Kandal和Takeo Provinces的1200公里〜(-2)区域中进行了一台管井调查监测62孔。每月监测深度深度,持续12个月。该调查在2002年重复,确定了管井的增加使用的效果在地下水位。结果遵循了每年相似的充电和抑制模式,并表示巴萨克河在距离西方有30公里的井里充电。它还表明,最大拉伸深度约为五米,这是离心泵可以吸水的限制。本研究的结果提供了可能有助于当局制定柬埔寨地下水的政策的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号