首页> 外文会议>American Council for an Energy-Efficient Economy study on energy efficiency in buildings >Strategies for Improving Persistence of Commissioning Benefits: Making Lasting Improvements in Building Operations
【24h】

Strategies for Improving Persistence of Commissioning Benefits: Making Lasting Improvements in Building Operations

机译:提高调试福利持久性的策略:持久改善建筑运营

获取原文

摘要

More and more building owners are turning to commissioning (Cx) and retrocommissioning (RCx) as cost-effective, quality assurance strategies for their building operations and maintenance. Commissioning ensures that a new building works correctly from day one, and retrocommissioning gets existing buildings' systems back on track. Although the building's systems may be well tuned at the end of the commissioning process, buildings may change over time, drifting away from their intended design and operating requirements. What can an owner, building manager, or operator do to avoid these problems and improve the long-term operations of their building? This paper describes a recently published set of strategies to improve persistence of benefits from commissioning. Based on California Public Interest Energy Research (PIER) completed in 2002, the following strategies that improve persistence are discussed: ? Design review ? Building documentation ? Operator training ? Building benchmarking ? Utility tracking ? Trend analysis ? Recommissioning ? Continuous Commissioning?
机译:越来越多的建筑业主正在转向调试(CX)和转移(RCX)作为其建筑运营和维护的经济效益,质量保证策略。调试可确保新的建筑物从第一天开始工作,并将其转移获取现有的建筑物系统回到轨道上。虽然建筑的系统在调试过程结束时可能会很好地调整,但建筑物可能会随着时间的推移而变化,漂移远离预期的设计和操作要求。所有者,建筑​​经理或操作员可以做些什么来避免这些问题,并改善他们建筑的长期运营?本文介绍了最近发表的一系列策略,以改善福利持续的福利。基于加州公共利益能源研究(码头)于2002年完成,讨论了改善持久性的以下战略:设计回顾 ?建筑文件?操作员培训?建筑基准?实用程序跟踪?趋势分析 ?重新推荐?连续调试?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号