A jackup-drilling rig drilled seven exploration wells in the U.K. and Norwegian sectors of the North Sea during a twoyear drilling program. By using sublet well commitments and assignments, the rig was secured in a very tight rig market. The drilling rig was shared between two Amoco (now a part of BP) business units for four wells and another major operator for three wells. The application of rig and personnel sharing produced over 10% (U.S. $12 million) cost savings to Amoco through shared lessons learned, continuous improvement, and reduced permitting time. An additional savings of over 10% (U.S. $12 million) was achieved through detailed planning and risk assessment that significantly reduced unscheduled-event (trouble) time. Key factors for success of the program include continuous use of the same rig, crews, and offshore team members; the vision and support of management; adequate well design and pre-planning time; and the commitment of the right people with the right talents to the projects. The same Amoco wellsite supervisors were utilized throughout the program (even as the rig moved from operator to operator). This paper summarizes how the sharing of a rig, people, and best practices can improve exploration drilling performance, even across different teams, business units, operators, and countries. Examples of sharing knowledge between project teams are presented to quantify the value of a long-term drilling rig contract for one-off exploration wells. The paper concludes by providing lessons learned from rig-sharing agreements and future applications of rig sharing.
机译:一座山地钻井钻井平台在U.K.和挪威北海钻井井里钻了七大勘探井。通过使用转租井承诺和作业,钻机在一个非常紧密的钻井平台市场中得到了固定。钻机在两个井和其他三个井的另一个主要操作员之间分享了两个Amoco(现在的BP)业务单位。通过共享的经验教训,持续改进和减少允许时间,钻机和人员分享的适用超过10%(美国1200万美元)的成本节约到Amoco。通过详细的规划和风险评估实现了超过10%(1200万美元)的额外节省,以显着减少未核心事件(麻烦)时间。该计划成功的关键因素包括持续使用同一台钻机,船员和海上团队成员;管理层的愿景和支持;适当的设计和预先计划时间;以及合适的人对项目的合适才能的承诺。在整个程序中使用相同的Amoco井层监控器(即使由于钻机从运营商移动到运营商)。本文总结了钻机,人民和最佳实践的共享如何改善勘探钻探性能,即使是不同的团队,业务单位,运营商和国家。提出了项目团队之间共享知识的例子,以量化一次性勘探井的长期钻机合同的价值。本文通过提供从分享协议和未来钻机分享申请中汲取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号