Lessons Learned From Treating 500,000 Tons of Oil-Based Drill Cuttings on Five Continents

机译:在五大洲治疗500,000吨的石油钻扦插的经验教训

获取原文

摘要

As Yogi Berra is fond of saying,"it ain't over till it's over". During any oil-based mud drill cuttings treatment project, the task is not complete until the solids are clean and permanently disposed,the oil is clean and reused,and the water is clean and recycled or discharged.The project is over when the wastes pass the auspices of the local environmental rules and are no longer an environmental risk.
机译:正如Yogi Berra喜欢的说法,“它就没有结束,直到它结束了”。在任何油型泥浆钻扦插处理项目中,任务尚未完成,直到固体清洁和永久性地设置,油清洁并重新使用,水清洁和回收或放电。当废物通过时,项目结束了当地环境规则的主持,不再是环境风险。