首页> 外文会议>Society of Petroleum Engineers International Symposium and Exhibition on Formation Damage Control >Completion of High-Rate Gas Wells, Horizontal Gravel Pack and Filter-Cake Cleanup: A Case History From the Mahogany Field, Trinidad
【24h】

Completion of High-Rate Gas Wells, Horizontal Gravel Pack and Filter-Cake Cleanup: A Case History From the Mahogany Field, Trinidad

机译:完成高速煤气井,水平砾石包和滤饼清理:桃花心木领域的案例历史,特立尼达

获取原文

摘要

Completing high-rate gas wells in areas where sand control is necessary ranks among the top challenges within the oil industry. High-velocity gas flowing through the downhole hardware combined with the abrasive nature of finer formation solids dislodged and produced can significantly shorten the completion life and have strong financial implications for the operator. This paper describes the gravel-pack and filter-cake cleanup techniques applied to Mahogany MB-13, an offshore horizontal openhole completion and Trinidad's best producing well at the time of its production start-up. Optimizing these operations, along with correct well configuration and precise borehole placement in the reservoir structure, were fundamental to achieving high production rates. The gravel placement method and the uniform coverage of the gravel-pack screens helped to deter the creation of high- velocity spots. This result allowed the operator to use higher drawdown pressure differentials without damaging the completion. Aspects of the sand-control design, gravel-pack placement to ensure complete wellbore coverage, and the chemicals and procedures for filter-cake cleanup are analyzed in depth. The new-generation sand-control service tools that were developed to preserve the optimum wellbore conditions from the end of drilling through the completion are also discussed. Finally, production data from the MB-13 are presented to support the completion efficiency reported.
机译:在石油工业内的最大挑战中,在砂控制是必要的区域的高速气井中完成高速燃气井。流过井下硬件的高速气体与更精细的形成固体的磨蚀性脱落并产生的磨蚀性,可以显着缩短完成生命,并对运营商具有强烈的财务影响。本文介绍了应用于桃花心木MB-13的砾石 - 包和滤饼清洁技术,在其生产启动时,沿海水平露天完成和特立尼达最佳生产。优化这些操作,以及储层结构中的正确井配置和精确的钻孔放置,是实现高生产率的基础。砾石放置方法和砾石包装屏幕的均匀覆盖有助于阻止创建高速斑点。该结果允许操作员使用更高的拔线压力差,而不会损坏完成。砂控制设计的方面,砾石 - 包装放置,以确保完全井筒覆盖,以及深入分析过滤滤饼清理的化学品和程序。还讨论了以完成完成,以保护最佳井眼条件的新一代砂控制服务工具。最后,提出了来自MB-13的生产数据以支持报告的完成效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号