Electricity Market Challenges under HVDC Multi Bipoles and Multi Vendors Environment: Experience Observations in Brazil - Topic: Market design and operation considerations in systems with significant HVDC

机译:HVDC多馅饼和多供应商环境下的电力市场挑战:巴西的经验观察 - 主题:具有重要HVDC的系统的市场设计和操作考虑

获取原文

摘要

It is well known that in the 1990's and early 2000's, many countries faced deregulation, re-regulation, privatization, re-structuring processes aimed at reaching a higher level of service efficiency as well to improve the level of transparency and quality to the electricity consumers in order to provide suitable market signals to private investors. In parallel to that, a strong political incentive to increase the application of clean energy into the electricity markets applied to every country/region have contributed to change some paradigms of the electrical sectors worldwide. In this context, HVDC applications have found an important niche to widening its market space. What we may see, for instance in Europe, is a large amount of HVDC projects interconnecting countries by sea cables as well as, noteworthy examples of off-shore wind farms, in the current range of 800 MW each, being planned or connected to the main grids through HVDC schemes (mostly using VSC). Important initiatives from the European Community are taking place aiming at the establishment of viable DC Grids (DCG) arrangements. Although no Direct Current Grids (DCG) are operational yet, it has been speculated by many researchers that such grids will provide significant benefits beyond the integration of multiple offshore wind farms dispersed over wide areas into AC onshore grid. On the other hand, large dimensioned countries such as China, India and Brazil, have also offered an outstanding opportunity for HVDC market improvement, by establishing huge transmission trunks of ±600 kV and ±800 kV DC, 4000 MW to 8000 MW and transmission line lengths around 2000 km. The worldwide Electricity Markets reforms have been based considering that the transmission segment of the industry is mainly AC. This is a valid premise, due to the highly predominance of this alternative to interconnect the grids. However, as we nowadays face more and more HVDC projects - where a highly concentrated technological content is present, unpredictable and unforeseen aspects of market regulation do show up as challenging aspects to be faced by Regulators, Investors, Utilities and System Operators. The Brazilian experience has some particularities due to the Regulatory Framework established in the recent past of granting new transmission concessions through public auctions. In addition, the Brazilian ISO, the ONS, does not own any of the transmission assets. This has led to the creation of many Transmission Agents sharing the grid installations. This paper elaborates on the potential issues derived from the expansion of new HVDC projects, especially in Brazil, from the standpoint of describing and ranking key issues which have been faced by ONS, in particular, in the context of how market rules have been influencing and, also, affecting the Brazilian transmission expansion activity. Some of the solutions found and issues remained unresolved, or under discussion, will be described and highlighted in order to profit from constructive debates.
机译:众所周知,在20世纪90年代和2000年初,许多国家面临放松管制,重新监管,私有化,重新构建流程,旨在达到更高水平的服务效率,以提高电力消费者的透明度和质量水平为了向私人投资者提供合适的市场信号。与此同样,强烈的政治动力将清洁能源应用于适用于每个国家/地区的电力市场,这是为了改变全世界电气界的一些范式。在这种情况下,HVDC申请已经找到了扩大其市场空间的重要利基。例如,我们在欧洲可能看到的是大量HVDC项目由海电缆互连国家,以及偏离岸上风电场的值得注意的例子,在每次800兆瓦的当前范围内,计划或连接到主电网通过HVDC方案(主要使用VSC)。欧洲共同体的重要举措正在旨在建立可行的直流网格(DCG)安排。虽然没有直接电流网格(DCG)尚未进行操作,但许多研究人员已经推测,这种网格将提供超出分散在宽岸网上的多个海上风电场的多个海上风电场的融合。另一方面,如中国,印度和巴西等大型各国也为HVDC市场改进提供了一个杰出的机会,通过建立巨大的传播中继为±600 kV和±800 kV DC,4000 MW至8000 MW和输电线路长度约为2000公里。全球电力市场改革一直基于考虑到行业的传输部分主要是AC。这是一个有效的前提,因为这种替代方案互连网格的高度优势。然而,正如我们现在面临越来越多的HVDC项目 - 那里存在高度集中的技术内容,市场监管的不可预测和不可预见的方面确实显示出挑战者,投资者,公用事业和系统运营商面临的具有挑战性的方面。由于在最近过去过去的监管框架通过公共拍卖,因此巴西经验具有一些特殊性。此外,巴西ISO,ONS不拥有任何传输资产。这导致创建许多传输代理共享网格安装的传输代理。本文从描述和排名在市场规则如何影响和排名所面临的关键问题的角度来看,阐述了新的HVDC项目的扩展,特别是在巴西的潜在问题。特别是在市场规则如何影响和排名也是影响巴西传输扩展活动。将描述和突出发现和讨论的一些解决方案和问题仍未得到解决,并突出,以便从建设性辩论中获利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号