首页> 外文会议>IEEE PES Power Systems Conference and Exposition >Consumed power control of time deferrable loads for frequency regulation
【24h】

Consumed power control of time deferrable loads for frequency regulation

机译:消耗功率控制时频率调节的可推迟负载

获取原文

摘要

Connection of a large number of dispersed generators to distribution networks is not easy due to various technical considerations. Thus we have been trying to devise a concept for future electrical distribution systems with a lot of dispersed generators. In this work, it has been considered that each customer's load and each generator's active and reactive power should be controlled in order to stabilize and optimize the networks. Under this consideration, two control methods for future distribution systems are proposed: a cooperative control and an independent control. An electric power system with a lot of time deferrable electric water heating and storage systems has been supposed, and the frequency regulation ability has been analyzed using the numerical calculation. The results of the analyses have shown that the frequency regulation ability becomes higher with the cooperative control than that with the independent control.
机译:由于各种技术考虑,大量分散的发电机与分配网络的连接并不容易。因此,我们一直在尝试为未来的电气配电系统设计有很多分散的发电机的概念。在这项工作中,应该考虑控制每个客户的负载和每个发电机的主动和无功功率,以稳定和优化网络。在这一考虑下,提出了两个用于未来分配系统的控制方法:合作控制和独立控制。已经假设具有大量时间可推迟电气加热和存储系统的电力系统,并且使用数值计算分析了频率调节能力。分析结果表明,利用与独立控制的合作控制变得更高的频率调节能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号