首页> 外文会议>IEEE PES Power Systems Conference and Exposition >UFLS program to ensure stable island operation
【24h】

UFLS program to ensure stable island operation

机译:UFLS计划确保稳定的岛屿运营

获取原文

摘要

This work highlights an introduction of UFLS (Under Frequency Load Shedding) program TEPCO (The Tokyo Electric Power Company, Inc.) has applied for more than 20 years and our experiences of dynamic simulation to determine the UFLS settings. The study concluded that the island separated from main grid where load - generation imbalance is greater than 30% can be saved by our unique UFLS scheme. Coordination with UFLS settings and over-excitation protection are critical to keep secure system performance.
机译:这项工作强调了UFL的引入(在频率负载脱落)Program Tepco(东京电力公司,Inc。)已申请20多年,我们的动态模拟经验确定UFLS设置。该研究得出结论,该岛与主要网格分离的岛屿,其中负荷不平衡大于30%,我们的独特UFL方案可以节省。与UFL设置和过励磁保护的协调对于保持安全的系统性能至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号