首页> 外文会议>Annual Conference for Young Scientists of China Association for Science and Technology >Application of Freezing and Row of Piles Method in Great Deep Foundation Pit
【24h】

Application of Freezing and Row of Piles Method in Great Deep Foundation Pit

机译:冻结和桩法在大深基坑中的应用

获取原文

摘要

The freezing and row of piles method was firstly applied in the south anchorage foundation pit of Runyang Yangtze River Bridge at home and abroad. In this article, the author introduces the problem happened during the construction and the procedures to solve the problem in particular. At last presents some viewpoints of the construction and the optimism of the design are given.
机译:首先应用于国内外伦阳长江桥南安锚坑坑的冻结和桩法。在本文中,提交人介绍了在施工期间发生的问题以及特别是解决问题的程序。最后提出了对结构的一些观点和设计的乐观。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号