首页> 外文会议>International symposium on role of concrete bridges in sustainable development >FROM LILLEB AELT TO ORESUND: DURABILITY DESIGN AND MAINTENANCE STRATEGIES FOR THE DANISH STRAIT CROSSINGS
【24h】

FROM LILLEB AELT TO ORESUND: DURABILITY DESIGN AND MAINTENANCE STRATEGIES FOR THE DANISH STRAIT CROSSINGS

机译:来自Lilleb Aelt到Oresund:耐用性设计和维修策略为丹麦海峡弗里克

获取原文

摘要

The bridging of the Danish straits, starting with the 1 km Lillebaelt bridge, opened in 1935, and culminating with the 18 km Storebaelt Link, completed in 1998, and the 16 km Oresund Link, operational since 2000, represent major societal investments in road and rail infrastructure. The paper describes the development of durability philosophy from the pre-war days, when structural concrete was considered virtually maintenance free, to the present, where the provision of corrosion monitoring devices are written into the contract documents, and operation and maintenance manuals are prepared in the construction phase. It is emphasised that in addition to obvious issues like concrete mix design, execution and inspection, structural lifetime performance is also determined by contract philosophy, quality assurance and management approach. These aspects are reviewed, with particular emphasis on the experience from the Storebaslt Link and the Oresund Link.
机译:丹麦海峡的桥梁,从1935年开业的1 km Lillebaelt Bridge,并与1998年完成的18 km Storebaelt Link开幕,并于1998年完工,自2000年以来,运营的16公里,代表了道路的主要社会投资铁路基础设施。本文介绍了从战前日开始的耐久性理念的发展,当时结构混凝土无论如何都被认为是免费的,在提供腐蚀监测设备被写入合同文件中,并准备了操作和维护手册建设阶段。强调,除了像混凝土混合设计,执行和检验等明显问题外,结构寿命性能也取决于合同哲学,质量保证和管理方法。审查了这些方面,特别强调了Storebaslt链路和oresund链接的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号