Safety Instrumented System Design and Implementation: Impacts to the Engineering and Construction Work Process

机译:安全仪表系统设计与实现:对工程和施工工程的影响

获取原文

摘要

The process industry in the United States is mandated to use the ANSI/ISA-84.01-1996 standard for the design and implementation of a safety instrumented system (SIS). The evolution of SIS requirements, however, continues with the acceptance of IEC-61511 and the anticipated move to this international standard in place of ANSI/IS A-84.01-1996 in the near future. Engineering and Construction (E&C) companies have substantial responsibility to design, engineer and construct process and industrial plants utilizing the safety instrumented systems consistent with the life-cycle requirements inherent in the current standards. This paper will discuss the work process currently followed by one E&C company from project development and execution through start-up and commissioning. The changes anticipated after full migration to IEC-61511 will also be covered, including timely design and analysis of SIS components, documentation, facilitation of owner/operator requirements, and conformance to standards. To an E&C company, the desirable goal is delivering a well-engineered SIS, in compliance with standards and codes with minimal engineering rework. It should include well-organized testing and final commissioning following the construction process, and a well-documented and maintainable system that meets customer expectations. The work process will also review the role of the manufacturer and systems integrator.
机译:美国工艺业的工艺业是使用ANSI / ISA-84.01-1996的设计和实施安全仪表系统(SIS)的标准。然而,SIS要求的演变继续接受IEC-61511,并预期到这一国际标准代替ANSI / A-84.01-1996在不久的将来。工程和建筑(E&C)公司对使用当前标准固有的生命周期要求一致的安全仪表系统,设计,工程师和建造工艺和工业设备具有重要责任。本文将讨论目前的工作流程,然后通过启动和调试执行项目开发和执行一家E&C公司。还将涵盖预期后预期的更改,包括及时的设计和分析SIS组件,文件,促进所有者/操作员要求,并符合标准。对于E&C公司来说,理想的目标是遵守具有最小工程返工的标准和代码,提供精心设计的SIS。在施工过程之后,它应包括良好组织的测试和最终调试,以及满足客户预期的良好记录和可维护的系统。工作过程还将审查制造商和系统集成商的角色。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号