首页> 外文会议>International Conference on Estuaries and Coasts >NUMERICAL INVESTIGATIONS ON EFFECTS OF THE RECLAMATION PROJECT ON HENGSHA EAST BEACH IN THE YANGTZE ESTUARY DEEPWATER CHANNEL
【24h】

NUMERICAL INVESTIGATIONS ON EFFECTS OF THE RECLAMATION PROJECT ON HENGSHA EAST BEACH IN THE YANGTZE ESTUARY DEEPWATER CHANNEL

机译:长江东海滩恒河东海滩垦区兴起的数值研究

获取原文

摘要

The effects of the Reclamation Project on the Hengsha East Beach in the Yangtze Estuary Deepwater Channel have been numerically simulated with an improved ECOM model. The results indicate that the project only has influences on the tide levels of the Baozhen, Liuxiao in the North Channel, and the Hengsha, Beicaozhong, Niupijiao in the North Passage, while the change in magnitude is within 5 cm. So it won't have much impact on the flood control of the Yantze Estuary. The Reclamation Project makes increase in the resistance of the flow in the North Passage as the project blocks off part of the flood tide flow which formerly enters the North Passage through Hengsha East Beach, and this will result in the decrease of the tide velocities in the North Passage. The project won't produce distinct effects on the splitflow ration between the South Channel and the North Channel as well as on that between the South Passage and the North Passage, which means it won't make negative effects on the Yangtze Estuary Deepwater Channel Regulation. Meanwhile, the Reclamation Project makes the high beach stable, and eliminate the current along the bank that is at the outboard of the North Jetty in the reclamation region, so the project will make positive effects on the stability of the North Jetty. And the conclusion can be obtained that the Reclamation Project on Hengsha East Beach is fit for the sediment treatment in the Yangtze Estuary Deepwater Channel Regulation as well as the river bed evolvement.
机译:在数值改善的ECOM模型中,在数值模拟了长江东海滩横滩东海滩的回收项目的影响。结果表明,该项目仅对北京河南,刘省刘省的潮水水平,以及北通道的北京,北京北京北京,而幅度的变化在5厘米范围内。因此,对林泽河口的洪水控制并不有太大影响。作为项目阻碍了以前进入北路通际东滩的洪水潮流的一部分,融入项目增加了北段流动的抵抗力,这将导致潮流速度降低北段。该项目不会对南京渠道和北渠道之间的分流汇价以及南部通道和北段之间产生明显的影响,这意味着它不会对长江河口深水渠道调节产生负面影响。同时,填海工程使高海滩稳定,消除了沿北码境内的港口境内的本行电流,因此该项目将对北码头的稳定性作出积极影响。可以获得结论,即恒山东海滩的回收项目适合长江河口深水渠道监管中的沉积物处理以及河床演变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号