首页> 外文会议>ASME Turbo Expo >Improving Operational Availability of Gas Turbine Generators aboard U.S. Navy DDG-51 Class Ships by Combining the Capabilities of the Integrated Condition Assessment System (ICAS) and the Generator Set's Full Authority Digital Controller (FADC)
【24h】

Improving Operational Availability of Gas Turbine Generators aboard U.S. Navy DDG-51 Class Ships by Combining the Capabilities of the Integrated Condition Assessment System (ICAS) and the Generator Set's Full Authority Digital Controller (FADC)

机译:通过组合集成条件评估系统(ICAS)和发电机组的全部权限数字控制器(FADC),提高燃气轮机发电机的运行可用性。

获取原文

摘要

Operational availability of Gas Turbine Generator Sets (GTGs) aboard the U.S. Navy's DDG 51 Class ships is being enhanced through the combined capabilities of the ship's Integrated Condition Assessment System (ICAS) and the GTG's Full Authority Digital Control (FADC). This paper describes the ICAS and FADC systems; their current capabilities and the vision of how those capabilities will evolve in order to improve equipment readiness and reduce life cycle costs.
机译:通过船舶集成条件评估系统(ICAS)的组合能力和GTG的全部权限数字控制(FADC),燃气轮机发生器套装(GTGS)的运行可用性正在加强美国海军的DDG 51级船舶正在增强。本文介绍了ICAS和FADC系统;他们目前的能力和这些能力如何发展的愿景,以提高设备准备,并降低生命周期成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号