首页> 外文会议>International Conference on Water and Environment >New Estimates Of The PMF At Selected Dam Sites In SW England
【24h】

New Estimates Of The PMF At Selected Dam Sites In SW England

机译:SW英格兰所选水坝网站上PMF的新估算

获取原文

摘要

All category A dams in the United Kingdom must have their spillway capable of safely passing the probable maximum flood (PMF). The PMF is estimated using estimates of probable maximum precipitation (PMP) and a runoff model which converts the rainfall intto runoff. New estimates of PMP have now been published and they are about 1.6 times greater than the existing estimates. When they are used in conjunction with soil hydraulic conductivity data and the UH (unit hydrograph) model the resulting PMF at several dam sites in SW England is from 1.5 to 3.0 times greater than the spillway design flood. This result implies that without the effects of any future climate change to; warmer and wetter conditions, dam spillways in the United Kingdom are seriously underdesigned.
机译:所有类别在英国的大坝必须有他们的溢洪道,能够安全地通过可能的最大洪水(PMF)。使用可能的最大降水(PMP)和径流模型的估计估计PMF,其将降雨INTO径流转换为径流。目前已发布了对PMP的新估计,它们大约比现有估算大约1.6倍。当它们与土壤液压导电性数据和UH(单位水文编号)结合使用时,SW英格兰的几个大坝地点的所得PMF比溢洪道设计洪水大的1.5至3.0倍。这一结果意味着没有任何未来的气候变化的影响;温暖和潮湿的条件,英国的大坝溢洪道受到严重损害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号