ELECTRIC POWER GENERATION EQUIPMENT SPECIFICATION SUPPLY IN THE RAPIDLY CHANGING GLOBAL REGULATORY SCENE

机译:电力发电设备规范与供应在快速变化的全球监管场景中

获取原文

摘要

The proliferation of new codes & standards for power generation equipment procurement, and their increased frequency of revision, contributes to an atmosphere of increasingly rapid change in global trade considerations. This dynamic environment has amplified intensely with each year, to an extent that the life cycle of a given standard is in many instances appreciably less than the delivery cycles of heavy machinery. Other issues are created by the slower pace of harmonization of codes & standards in the European Union (EU), US and elsewhere. These codes & standards cover requirements that include emissions, acoustics, and safety that exert pronounced effects on the design, manufacture, and integration of power plant components. Conformity assessment partnering and the importance of other expert interpretation services are a key component to successfully meeting evolving compliance requirements. Delivering Customer Fulfillment for the Order to Remittance (OTR) phase of a project must be circled back to the Inquiry to Order (ITO) front end of the business cycle for new proposals. Another interesting arena is the relationship of advanced prime mover design balanced with the need for standardization to meet these regulatory challenges in the face of high production volume. The typical power generation project cycle, measured in terms of years, coupled with the present high demand worldwide results in orders for equipment that in many cases can't foresee regulatory requirements 2 to 3 years into the future. Examples include projects in the EU where the Pressure Equipment Directive (PED) and Atmospheres Explosive (ATEX) Directive have mandatory compliance dates of May 2002 and June 2003 respectively. Electric power generation Original Equipment Manufacturers (OEMs) and their suppliers must plan for and price into contracts compliance with these laws years before the equipment is built and shipped. This is further complicated by the interpretation of specific requirements and the definition of the OEM conformity assessment strategy. To rectify this situation, it is recommended that steps be initiated to accelerate the worldwide harmonization of technical standards. In addition, consideration for the delivery cycles and commissioning of new power plants must be included in the regulatory process and in setting the dates for mandatory compliance with regional law.
机译:发电设备采购的新守则和标准的扩散及其增加的修订频率,有助于全球贸易考虑因素日益快速变化的氛围。这种动态环境每年都很强烈扩增,在某种程度上,给定标准的生命周期在许多情况下明显低于重型机械的输送周期。其他问题是由欧盟(欧盟),美国和其他地方的统一和标准协调速度较慢的速度。这些代码和标准涵盖了包括排放,声学和安全性的要求,可以发出对电厂组件的设计,制造和集成的发出显着影响。符合性评估合作和其他专家解释服务的重要性是成功满足不断遵守的合规性要求的关键组成部分。为项目的汇率提供客户履行(OTR)阶段必须循环回到新建议的商业周期的订单前端的询问。另一个有趣的竞技场是先进的主要动机设计与规范化的需要,以满足面对高产量的监管挑战。典型的发电项目周期,根据年来衡量,加上目前的高需求全球,在许多情况下,在许多情况下无法预见到未来的监管要求。示例包括欧盟的项目,其中压力设备指令(PED)和大气爆炸(ATEX)指令分别有2002年5月和2003年6月的强制性合规日期。电力发电原始设备制造商(OEM)及其供应商必须在建造和运输设备之前规划和价格遵守这些法律。这是通过对特定要求的解释和OEM符合性评估策略的定义进一步复杂化。为了纠正这种情况,建议启动步骤以加速全球技术标准的协调。此外,还必须在监管过程中介绍对交付周期和调试的审议,并设定强制性遵守区域法的日期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号