首页> 外文会议>SAE World Congress >Managing System Design Process Using Axiomatic Design: A Case on KAIST Mobile Harbor Project
【24h】

Managing System Design Process Using Axiomatic Design: A Case on KAIST Mobile Harbor Project

机译:使用公理设计管理系统设计过程:凯斯特移动港口项目案例

获取原文

摘要

As world-wide container volume increases and very large container ships emerge as a dominant player in the maritime cargo transport market, functional capabilities of container ports need to be greatly enhanced. To address this problem, KAIST is undertaking a project to design a novel container transport system, namely Mobile Harbor. Mobile Harbor refers to a system that can go out to a large container ship anchoring in the open sea, load and unload containers between the container ship and the Mobile Harbor, and transport them to their destinations. Designing Mobile Harbor presents a number of challenges as with many other large-scale engineering projects, especially at the beginning stage of the project. The challenges include diverse system mission scenarios that bring a wide range of different functional needs and constraints, large solution space with rather ambiguous concept selection criteria, difficulty in communicating ideas and concepts among many project participants with diverse background, and constant budget and time pressure, to name a few. For this kind of large, complex projects, the ability to effectively manage system design issues plays an essential role in determining the quality of outcomes of such projects. Properly defining and disseminating Functional Requirements, clarifying interface requirements between its subsystems, and identifying potential conflict, i.e., functional coupling, at the earliest stage of design as much as possible are all part of what need to be managed in a system design project. In this paper, we discuss the KAIST Mobile Harbor project to describe challenges and issues of system design, and illustrate how Axiomatic Design process can facilitate design tasks for a large, complex system.
机译:随着世界范围的集装箱量增加,非常大的集装箱船作为海事货物运输市场中的主导球员出现,需要大大提高集装箱港口的功能能力。为了解决这个问题,Kaist正在进行一个项目来设计一个新颖的集装箱运输系统,即移动港。移动码头是指一个系统,可以将一个大型集装箱船锚定在开放海,装载和卸载集装箱和移动港口之间的装卸,并将其运送到他们的目的地。设计移动码头呈现出许多其他大型工程项目的挑战,特别是在项目的开始阶段。挑战包括多样化的系统使命场景,带来广泛的不同功能需求和限制,大型解决方案空间,具有相当暧昧的概念选择标准,难以传播许多项目参与者之间的想法和概念,以及持续预算和时间压力,命名几个。对于这种大型,复杂的项目,有效管理系统设计问题的能力在确定这些项目的结果质量方面发挥着重要作用。正确定义和传播功能要求,阐明其子系统之间的界面要求,以及识别潜在冲突,即功能耦合,尽可能最早的设计阶段是需要在系统设计项目中管理的所有部分。在本文中,我们讨论了Kaist Mobile Harber项目来描述系统设计的挑战和问题,并说明了分支性设计过程如何促进设计的大型复杂系统的设计任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号