Design and construction of a steep incline for entrance staircase of subway station

机译:地铁站入口楼梯陡坡的设计和建设

获取原文

摘要

In the site of Iidabashi Station of the Metropolitan Oedo Subway Line, a staircase incline 40m long, linking the station premises with the surface, was constructed by a tunneling method other than the cut-and-cover technique, because it is located under a road with heavy traffic and numerous underground structures. The tunnel, accommodating stairs and elevators, has a great incline of 30 degrees. It was therefore impossible to perform the pipe jacking or shield tunneling, and consequently the mountain tunneling method (NATM) was adopted. In view of the unconsolidated ground, high groundwater level, and small earth covering of 8 to 15 m, chemical grouting, vertical reinforcement bolting and forepoling implemented as auxiliary methods. The large egg-shaped section was of about 70 m~2, that corresponds to a two-lane motorway tunnel, was divided into four portions for ensuring face stability. Under the stringent control by measurement of displacements, the construction was completed without exerting adverse impacts on the surroundings.
机译:在大都市戸号线,一梯倾斜40米饭田桥站的部位长,连接与所述表面车站场,是由比所述切断及盖技术其它的隧穿方法构建,因为它是设置在道路下交通繁忙,众多地下结构。隧道,可容纳楼梯和电梯,具有30度的倾斜度。因此,不可能执行管道或屏蔽隧道,因此采用了山地隧道方法(NATM)。鉴于未计算的地面,高地下水位和小地球覆盖率为8至15米,化学灌浆,垂直增强螺栓连接和脱落作为辅助方法。大的蛋形部分约为70m〜2,其对应于双车道高速公路隧道,分为四个部分以确保面部稳定性。在通过测量位移的严格控制下,建设完成而不会对周围环境产生不利影响。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号